Hana Mining confirms large potentials of Ghanzi Project
Wednesday, May 14, 2008
The company announced last Friday in a statement that all 10 holes intersected copper-silver mineralisation in two zones. Three of the holes, HA-17, 18 and 19-D were drilled along a 200 meter strike length in Zone 1 and the remaining seven, HA-20-D and HA-22 to 27-D, were drilled along a 300 meter strike length in Zone 2 to the south-west. These two zones are located approximately 13km apart.
Company president Peter Wilson states: "This is an exceptional mineralised system and our drill results are beginning to show the tremendous upside potential of the Ghanzi project.
‘A man’s country is not a certain area of land, of mountains, rivers, and woods, but it is a principle and patriotism is loyalty to that principle’.- George William CurtisAccording to the report carried in this publication, the fraudsters operating the so-called “dark fleet” have selected Botswana’s flag as their cover of choice. This is a direct assault on our country’s most valuable asset, the good name.For decades, Botswana has...